2020 (ongoing)
Expansion
70 km
Expansion
Investor
PKP Polskie Linie Kolejowe S.A
- Elevation of the design and implementation base (linked to the state grid), to which the x, y, and z coordinates of the completed objects will be referred to,
- Delineation of objects,
- Post-construction inventory,
- Execution of geodetic as-built documentation.
- Fieldwork
- The contract management will involve ongoing execution of orders related to staking out railway, road, and bridge works, construction and reconstruction of underground network equipment elements and their current post-completion inventory for both monthly sales /measurements/ needs and the final post-completion report.
- Delineation and stabilization of the main elements of objects based on the geodetic framework (design-implementation base).
- The contractor’s independent acquisition of main route point locations, including coordinates and benchmarks.
- Determination of working height points concerning benchmarks.
- Measurement inventory for acceptance of works: partial, subject to concealment and final, indicating any changes concerning the project.
- Quality control of works
- Purchase and installation of hectometre boards
- Due to the size of the construction, the required precision, and the fast implementation deadline, we are implementing a measurement system which is GPS/GLONASS/Galileo/Compass measurement technology for geodetic service purposes.
- post-execution measurements should:
- measurement of railway infrastructure elements;
- measurement of buildings and structures;
Measurement of underground utilities carried out in the excavation before backfilling.